Dwell – The roof is complete and interior carpentry is nearing finish.

1150 N American St. – Foundation is moving forward.  Modular boxes have begun shipping to Philadelphia.  Modular set is on track for March 2nd start date.

The Vault – Is moving along.  Flooring and all finishes are progressing nicely. Wall paper and paint are ongoing.

808 N 19th – Excavation is on going.

VBC | Manufacturing

American Street – Started shipping 2/3/20.

The plant has finished Big Horn projects both Big Horn Multi and Big Horn Town Homes.

The plant is presently working on 19th Street project for Philadelphia, Pa.

We will began 4233 Chestnut Street for Philly also in Feb. This project will include the intro to our “bath pod line”. (bathrooms built off-line on a separate production line and installed complete in the units.)

In addition, the VBC | Manufacturing team participated in forklift training. AEST was present and was able to train 5 team members on forklift safety and usage. We are grateful for our partnership with Richmond Community College, which afforded us the opportunity to participate in this training. Those on the team who received the training are:

  • Joseph Cole
  • Justin Lowery
  • Ramon Slocum
  • Kevin Campos
  • Anthony Driggers